During the renovation of the main heating plant, the hot water supply to a municipal district heating network could not be interrupted. Coolworld installed two mobile heating plants as a temporary solution in less than 48 hours.
How was Coolworld able to help the district heating specialist?
- Extensive work on the main heating plant required a temporary heat supply without any downtime.
- Coolworld installed two mobile heating plants, each with a capacity of 2 MW, to ensure hot water production.
- The systems were integrated via the customer’s existing hydraulic connections—without any interruption for consumers.
- The Coolworld team completed on-site deployment and commissioning in less than 48 hours.
All info at a glance
District heating networks require uninterrupted service. During the renovation of the main heating plant, two mobile heating plants (2 MW each) took over heat production. They were integrated via existing hydraulic connections, ensuring that all customers received hot water without interruption.
-
District Heating SpecialistInstaller for municipal district heating networks with a high supply obligation.
-
Renovation Without InterruptionMain heating plant undergoing renovation—hot water had to remain available at all times.
-
2 × 2 MW Mobile Heating PlantsTwo self-sufficient 2-MW heating plants ensured heat production as a temporary solution.
-
Ready for operation in < 48 hoursQuick installation via existing hydraulic connections – operation without downtime.
“We were particularly impressed by the combination of speed and precision: connection to our existing hydraulic points, smooth commissioning, and a stable supply. It’s great how Coolworld got this up and running in such a short time.”