- The cooling system failed shortly before the summer season, requiring a quick temporary solution.
- The Coolworld unit provides 800 kW of cooling capacity for climate control.
- The rental solution ensures continuous cooling in the shopping center.
Fast rental solution for cooling failure at Migros MParc
The air-conditioning system at Migros MParc La Praille failed shortly before the start of the summer season and at the beginning of the COVID-19 pandemic. As replacing the system at such short notice was not possible, the team opted for a temporary rental solution, which Coolworld provided quickly and with minimal disruption.
-
High cooling capacity
The 800 kW rental system reliably provides air conditioning for the 22,000 m² centre.
-
Location and size
MParc La Praille in Carouge is a large shopping centre near Geneva, with a variety of shops and restaurants.
-
Fast installation and connection
Thanks to efficient on-site collaboration, the Coolworld rental solution was installed and connected to the hydraulic and building management systems on the same day.
-
Prepared delivery for pandemic planning
Coolworld arranged for the system to be stored in advance at the crane company’s premises to prepare for any potential disruptions during the pandemic.
Contact your local representative today.
“We are extremely satisfied with this rental solution and the excellent support provided by Coolworld, from delivery through to the end of the rental period. It was a very positive experience overall. Installation and commissioning went smoothly, as did the day-to-day operation.”
About Migros MParc Carouge
Migros MParc La Praille is one of the largest shopping centres in the canton of Geneva and maintains high standards in air conditioning and energy efficiency. The centre features modern technical infrastructure, including solar installations, to serve both customers and employees.
-
Large shopping centre
MParc covers 22,000 m² and includes a variety of shops and restaurants, including Mélectronics and SportXX.
-
Customer comfort comes first
Reliable air conditioning is essential for the comfort of both customers and employees.
-
Energy-efficient solar system
The shopping centre operates a solar power system to generate electricity sustainably.
-
Coordination of all partner companiesThe rental solution was implemented in close cooperation with all technical service providers and partner companies.
Efficient collaboration for rapid commissioning
Coolworld coordinated the technical implementation in collaboration with the building management team and external service providers, including crane and hydraulic companies. Despite the restrictions caused by the pandemic, the rental system was quickly lifted onto the roof and connected, ensuring that cooling was operational in time for the summer season.